PROJECT:CONSTRUCTION OF ANIMAL FEED MILL
Construction of Industrial Solid Waste Treatment Plant at Sohar
Free Zone Phase-III.
ITC boasts the successful Award of Industrial Solid Waste Treatment Plant at Sohar Free
Zone Phase-III for end client Beah.
Construction of the Industrial Solid Waste Treatment Plant at Sohar Free Zone Phase-III with
Total BUA: 44,000 sqm.
SCOPE OF WORK
- This project was for the stilling Basin (SB), Oil Storage and Handling (OS), Stripping Area (SA) and all related like pipe works, RCC, HDPE Lining to RWTP Rima which includes the construction of following elements :
- Topsoil removal, transport to the processing area, sorting and fractionating.
- Rock cutting min 30 cm below the bottom of the pipes and 50 cm of either side, supply and laying of pipes and related fittings and valves in various diameters including sand bed, structural backfilling.,
- RCC works for SB inlet structure, SB outlet structure and valve chamber including surface protection, supply ,laying, fixing and welding of HDPE lining including geotextile, top soil removal, weathered rock cutting, hard rock cutting, backfilling, hdpe liner, SA vertical block installations.



