PROJECT:CONSTRUCTION OF IRON & STEEL ROLLING MILL
Construction of Moon Iron & Steel (MISCO) Rolling Mill at Suhar.
ITC boasts the successful completion of Moon Iron & Steel Plant at Suhar.
Construction of the Rolling mill included but not limited to Building Foundation, Equipment
Foundation, Civil Buildings, Scale Pit & OH Tanks, Cable tunnel, Pipe Tunnel, Trenches and
Finishing Works.
SCOPE OF WORK
- This project was for the stilling Basin (SB), Oil Storage and Handling (OS), Stripping Area (SA) and all related like pipe works, RCC, HDPE Lining to RWTP Rima which includes the construction of following elements :
- Topsoil removal, transport to the processing area, sorting and fractionating.
- Rock cutting min 30 cm below the bottom of the pipes and 50 cm of either side, supply and laying of pipes and related fittings and valves in various diameters including sand bed, structural backfilling.,
- RCC works for SB inlet structure, SB outlet structure and valve chamber including surface protection, supply ,laying, fixing and welding of HDPE lining including geotextile, top soil removal, weathered rock cutting, hard rock cutting, backfilling, hdpe liner, SA vertical block installations.