PROJECT: WATER DAMS
Design & Build of Ghuzayn
Water Dams
Mawarid Mining
Ghuzayn, Oman
12 Months
OMR 0.87 Million
SCOPE OF WORK
- Construction of deepening of existing water dams along with the Geotextile and HDPE Liner protection works.
- Construction of raw water dams and brine evaporation dams along with the protection works with Geotextile and HDPE line works.